acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/rioenlinea/public_html/riodesarrollo/wp-includes/functions.php on line 6121A las 8 de la ma\u00f1ana con 40 minutos aproximadamente se produjo un accidente que involucr\u00f3 a un cami\u00f3n que, cuando pasaba por el lugar, quebr\u00f3 dos postes de energ\u00eda el\u00e9ctrica. <\/strong><\/span><\/p>\n De momento, unidades de SAESA se mantienen en el lugar intentando aislar la falla, para reponerla a la brevedad. A\u00fan no hay un horario estimado para la reposici\u00f3n del servicio.<\/p>\n EN DESARROLLO…\u00a0<\/em><\/p>\n","protected":false},"excerpt":{"rendered":" A las 8 de la ma\u00f1ana con 40 minutos aproximadamente se produjo un accidente que involucr\u00f3 a un cami\u00f3n que, cuando pasaba por el lugar, quebr\u00f3 dos postes de energ\u00eda el\u00e9ctrica.<\/p>\n","protected":false},"author":12,"featured_media":30395,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[109,823,822],"class_list":["post-30394","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-social","tag-accidente","tag-cables-cortados","tag-corte-de-luz"],"_links":{"self":[{"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/posts\/30394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/comments?post=30394"}],"version-history":[{"count":0,"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/posts\/30394\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/media\/30395"}],"wp:attachment":[{"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/media?parent=30394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/categories?post=30394"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/riodesarrollo.rioenlinea.cl\/wp-json\/wp\/v2\/tags?post=30394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
\nPese a esto, la empresa que se encarga del suministro de energ\u00eda, deber\u00e1 reponer ambos postes que a\u00fan permanecen en el suelo.<\/p>\n